Corwen, North Wales
A hydro power system including the use of an existing reservoir, a penstock pipe running down a hillside which is mostly underground and a section of penstock pipe which is required to be overground and terminates at a turbine house.
A full landscape and visual assessment was carried out including sites visits, photos, landscape and visual report, visualisations and plans.
Planning Permission was granted in September 2014.